Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
ROCKLAND- WEYMOUTH- RECONSTRUCTION OF EAST & WEST PARKWAY (DESIGN-BUILD)
The project consists of the construction of a one mile section of road within the over-all 2.5 mile East-West Parkway/Eastside Connectivity Improvements. The overall project will consist of the construction of a four-lane roadway on new alignment from Route 18 just north of the railroad station, narrowing to 2 lanes at Old Swamp River, and continuing off the base to Reservoir Park Drive in Rockland. Work within the limits of this project begin in Weymouth approximately 1100 feet west of the Weymouth/Rockland line and continues easterly through Rockland for a total project length of one mile. In addition to the roadway construction, work will also include the installation of traffic signals at the westerly limits of the project in Weymouth, installation of a signalized pedestrian crossing, and construction of a four-lane roundabout in Rockland. Also included will be the construction of a shared use path on the northern side of the roadway, a sidewalk on the southern side, and a turtle crossing culvert.
Location:
  • Town of Rockland
  • Town of Weymouth
  • Resident Engineer: Russell Davis
    Construction Contract Value: $10,786,783.00
    Construction Bid Price: $10,445,500.00
    Initial Construction Estimate: $11,550,877.00
    District: District 5

    Contracts (3) Progress
    # 57731 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassHighway on an open end basis for various highway and bridge projects. Final
    # 60139 -- Design -- Bridge Rehab/Recon/New Const
    Work will consist of structural evaluations and emergency design support servives to support the Bridge Preservation/Betterment Program. Final
    # 66332 -- Construction Contract
    Construction of East – West Parkway Phase 1. (DESIGN / BUILD) Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 01/18/2011
    Contract Information
    Project Designer: Consultant
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 10/28/2009
    Project Initiation Form PIF Entered 11/17/2009
    Project Initiation Form PRC Submitted 11/17/2009
    Project Review Committee PRC Approved 10/30/2009
    Project Status Initiated 12/12/2005
    Project Status Advertised 08/07/2010
    Project Management