Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
BOSTON- BRIDGE REPLACEMENT, B-16-020=C-09-004, CHELSEA STREET OVER THE CHELSEA RIVER
The proposed vertical lift bridge will be a truss type structure that spans 450 feet from bank to bank and will provide 175 feet of vertical clearance in the raised position. The bridge and approach roadway match the footprint of the existing bridge and will provide for four lanes of traffic (two in each direction) and two pedestrian sidewalks. Approach roadways will be reconstructed as needed to meet the existing local streets. A complete warning signal and gate system will be provided at the approach roadways. The warning gate and bridge traffic signal operations will be interconnected with the Central Avenue/Marginal Street/Eastern Avenue intersection in Chelsea to provide for continuous traffic operations in the intersection during bridge openings.
Location:
  • City of Boston
  • Resident Engineer: Daniel Casaletto
    Construction Contract Value: $125,491,530.96
    Construction Bid Price: $112,728,287.00
    Initial Construction Estimate: $94,102,550.00
    District: District 4

    Contracts (11) Progress
    # 115768 -- Design -- Services
    Statewide - Master Service Agreement for design and review services. Final
    # 51302 -- Design -- Hwy Eng Open End
    Statewide - work will consist of providing engineering design and review services to the MassHighway on an open end basis for various statewide highway and bridge projects. Final
    # 54828 -- Design -- Bridge Open End
    Work will consist of providing engineering design and review services to MassHighway on an open basis for various statewide highway and bridge projects. Final
    # 56139 -- Construction Contract
    Boston - Chelsea - Bridge Replacement - B-16-020=C-09-004 (Vertical Lift Drawbridge) Chelsea Street over Chelsea Creek Completed
    # 57728 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassHighway on an open end basis for various highway and bridge projects. Final
    # 57729 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassHighway on an open end basis for various highway and bridge projects. Final
    # 68385 -- Design -- Bridge Open End
    Work will consist of providing engineering design and review services to MassDOT on an open end basis for various statewide highway and bridge projects. Final
    # 69755 -- Design -- Bridge Open End
    Work will consist of providing engineering design and review services to MassDOT on an open end basis for various highway and bridge projects. Final
    # 69762 -- Design -- Bridge Open End
    Work will consist of providing engineering design and review services to MassDOT on an open end basis for various highway and bridge projects. Final
    # 77865 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final
    # 77867 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final

    Bridges

    Contract Dates
    Notice to Proceed: 10/28/2008
    Contract Information
    Project Designer: Municipality
    Funding Source: BRR OFF SYSTEM
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Review Committee PRC Approved 12/01/2005
    Project Review Committee Letter 12/08/2005
    Project Status Initiated 09/21/2005
    Project Status Advertised 09/15/2007
    Project Status Advertised 04/05/2008
    Project Management
    100% Design 100% Package Received 10/11/2005
    100% Design 100% Package Comments to DE 02/28/2006
    Final Design PS&E Received 08/02/2007
    Final Design PS&E to FAPRO 08/29/2007