Project Description:
BARNSTABLE- RESURFACING AND RELATED WORK ON ROUTE 6A
The purpose of this project is to perform resurfacing and related work on the state owned sections of Route 6A in Barnstable. Also included in the project is the resurfacing of existing sidewalks within the project limits and minor drainage improvements. Work extendes from MM 8.12 to MM 16.56 for a distance of 7.57 miles.
Location:
  • Town of Barnstable
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: MassDOT
    Project Manager: Albert Li
    Estimated Total Contract Cost: $2,990,141.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 5
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information