Project Description:
ACTON- CARLISLE- WESTFORD- BRUCE FREEMAN RAIL TRAIL EXTENSION, INCLUDING 6 RAILROAD BRIDGES & 1 NEW BRIDGE OVER ROUTE 2A/119 (PHASE II-A)
The proposed project will extend from the end of the BFRT Phase 1 (Westford-Lowell Phase) and continue south through Westford, Carlisle and Acton for a total length of approximately 4.88 miles. The construction will include: a new variable width (ranges from 10 to 12 feet) paved asphalt multi-use rail trail with 2-foot stabilized shoulders, an adjacent 6 foot stone dust trail (provided where feasible), trail pavement markings and signing, passively actuated flashing beacons at trail/roadway crossings, new roadway pavement markings and signing at trail crossings, construction of a pre-fabricated pedestrian bridge structure over Route 2A/119, rehabilitating six existing railroad bridges along the trail, constructing culverts, earthwork, landscaping and other items incidental to the construction of the rail trail.
Location:
  • Town of Acton
  • Town of Carlisle
  • Town of Westford
  • Resident Engineer: Patrick Marion
    Construction Contract Value: $10,956,973.00
    Construction Bid Price: $9,881,430.00
    Initial Construction Estimate: $9,693,000.00
    District: District 3

    Contracts (6) Progress
    # 55035 -- Design -- Bridge Rehab/Recon/New Const
    Work will consist of structural evaluations and emergency design support services to support the Bridge Preservation/Betterment Advertisement Program. Final
    # 57463 -- Design -- Bridge Open End
    Work will consist of providing engineering design, review and construction management services on a task order basis. Final
    # 64315 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final
    # 65757 -- Design -- Geotechnical
    Work will consist of Geotechnical Review during the design of bridge structures and/or roadways owned by MassDOT and Cities and Towns throughout the Commonwealth. Final
    # 68386 -- Design -- Bridge Open End
    Work will consist of providing engineering design and review services to MassDOT on an open end basis for various statewide highway and bridge projects. Final
    # 84972 -- Construction Contract
    Construction of the Bruce Freeman Rail Trail (Phase IIA) Including 6 Bridge Replacements and New Bridge Construction Br. No. A-02-014 (Steel) over Route 2A/119 (Great Road) Completed

    Bridges

    Contract Dates
    Notice to Proceed: 06/23/2015
    Contract Information
    Project Designer: Municipality
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 09/04/2007
    Project Initiation Form PRC Submitted 09/10/2007
    Project Review Committee PRC Approved 09/10/2007
    Project Review Committee Letter 11/16/2007
    Project Status Advertised 09/13/2014
    Project Management
    100% Design 100% Package Received 03/18/2014
    100% Design 100% Package Comments to DE 06/20/2014
    25% Design 25% Package Received 04/07/2008
    25% Design 25% Package Comments to DE 01/28/2009
    25% Design 25% Package Approved 05/11/2010
    25% Design Design Public Hearing 10/29/2008
    75% Design 75% Package Received 11/06/2012
    75% Design 75% Package Comments to DE 10/23/2013
    Final Design PS&E Received 09/02/2014
    Final Design PS&E Received 11/05/2014
    Final Design PS&E to FAPRO 09/03/2014