Project Description:
|
ACTON- CARLISLE- WESTFORD- BRUCE FREEMAN RAIL TRAIL EXTENSION, INCLUDING 6 RAILROAD BRIDGES & 1 NEW BRIDGE OVER ROUTE 2A/119 (PHASE II-A)
The proposed project will extend from the end of the BFRT Phase 1 (Westford-Lowell Phase) and continue south through Westford, Carlisle and Acton for a total length of approximately 4.88 miles. The construction will include: a new variable width (ranges from 10 to 12 feet) paved asphalt multi-use rail trail with 2-foot stabilized shoulders, an adjacent 6 foot stone dust trail (provided where feasible), trail pavement markings and signing, passively actuated flashing beacons at trail/roadway crossings, new roadway pavement markings and signing at trail crossings, construction of a pre-fabricated pedestrian bridge structure over Route 2A/119, rehabilitating six existing railroad bridges along the trail, constructing culverts, earthwork, landscaping and other items incidental to the construction of the rail trail.
|