Project Description: |
LYNNFIELD- PEABODY- INTERSTATE MAINTENANCE & RELATED WORK ON I-95
The project involves the resurfacing of both directions of I-95 in Lynnfield and Peabody. The project begins on I-95 at the Wakefield/Lynnfield townline and extends northerly to the Lynnfield Peabody town line. The project continues northerly into Peabody ending on I-95 after the Forest Street bridge and ending on Rt. 128 at the I-95 NB onramp in Peabody. The length of the project is 25,462-feet or 4.82 miles.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | Albert Li![]() |
Estimated Total Contract Cost: | $9,008,047.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 4 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|