| Project Description: |
FITCHBURG- BRIDGE REPLACEMENT, F-04-053, ASHBY WEST ROAD OVER THE SCOTT RESERVOIR OUTLET
The Ashby West Road bridge over the Scott Reservoir Outlet is a structurally deficient, functionally obsolete structure. The purpose of this project is to replace the bridge with a single span superstructure. The proposed abutments are to be located behind the existing abutments. A detour will be established during construction.
|
| Location: |
|
| Resident Engineer: | Stephen Romano![]() |
| Construction Contract Value: | $1,034,552.00 |
| Construction Bid Price: | $890,480.00 |
| Initial Construction Estimate: | $1,021,212.00 |
| District: | District 3 |
|