SOMERVILLE- BRIDGE REPLACEMENT, S-17-025, ROUTE 28 (MCGRATH HIGHWAY) OVER GILMAN STREET (AKA - GILMAN STREET BRIDGE)
The expected work for this project shall consist of, but not be limited to removing and replacing the superstructure. The proposed bridge will have two sidewalks, 3 lanes each way and a raised median. Also included will be a new bridge barrier screen along the existing retaining wall, across the bridge, and on to the first intersection to the north. The work is expected to be done in multiple stages while maintaining traffic during all stages of construction. One pedestrian sidewalk, 5.5’ minimum shall be available. Two travel lanes on McGrath Highway in each direction is a minimum. Gilman Street is expected to be closed to traffic during all stage of construction.
Location:
  • City of Somerville
  • Resident Engineer: Juan Taveras
    Construction Contract Value: $9,013,850.00
    Construction Bid Price: $7,125,000.00
    Initial Construction Estimate: $6,803,447.00
    District: District 4

    Contracts (5) Progress
    # 55040 -- Design -- Bridge Rehab/Recon/New Const
    Work will consist of structural evaluations and emergency design support services to support the Bridge Preservation/Betterment Advertisement Program. Final
    # 64308 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final
    # 68384 -- Design -- Bridge Open End
    Work will consist of providing engineering design and review services to MassDOT on an open end basis for various statewide highway and bridge projects. Final
    # 69763 -- Design -- Bridge Open End
    Work will consist of providing engineering design and review services to MassDOT on an open end basis for various highway and bridge projects. Final
    # 80677 -- Construction Contract
    Bridge Replacement (S-17-025) (Steel) - Route 28 (McGrath Highway) over Gilman Street. (ABP) Completed

    Bridges

    Contract Dates
    Notice to Proceed: 07/02/2014
    Contract Information
    Project Designer: Consultant
    Funding Source: Non Federal Aid
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Review Committee PRC Approved 12/01/2005
    Project Review Committee Letter 12/09/2005
    Project Status Initiated 10/12/2005
    Project Status Advertised 12/07/2013
    Project Management
    100% Design 100% Package Received 03/26/2013
    25% Design 25% Package Received 07/22/2011
    75% Design 75% Package Received 06/22/2012
    Final Design PS&E Received 11/13/2013
    Consultant Contract Process Scope to DE 03/22/2010