| Project Description: |
CONCORD- RECONSTRUCTION OF MAIN STREET (ROUTE 62) FROM WATER STREET TO THE ACTON T.L.
The purpose of this project is to reconstruct a 1.2 mile secton of Main Street. The project includes the reclamation and repaving of the existing roadway, installation of granite curbing, Americans with Disabilities Act improvements, drainage upgrades, and the addition of a sidewalk from Brook Trail Road to the Acton Town Line.
|
| Location: |
|
| Design Responsibility: | Municipality |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Albert Miller![]() |
| Estimated Total Contract Cost: | $3,362,805.16 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||