Project Description: |
MARSHFIELD- BRIDGE REPLACEMENT, M-07-007, BEACH STREET OVER THE CUT RIVER
The purpose of this project is to replace a locally owned, structurally deficient bridge carrying Beach Street over the Cut River in Marshfield in the same location with two sidewalks.
|
Location: |
|
Construction Begins: | Summer 2018 |
Resident Engineer: | Peter Benkart |
Construction Bid Price: | $3,375,660.57 |
District: | District 5 |
|
Bridges
|
|
|
|
|