| Project Description: |
MARSHFIELD- BRIDGE REPLACEMENT, M-07-007, BEACH STREET OVER THE CUT RIVER
The purpose of this project is to replace a locally owned, structurally deficient bridge carrying Beach Street over the Cut River in Marshfield in the same location with two sidewalks.
|
| Location: |
|
| Construction Begins: | Summer 2018 |
| Resident Engineer: | Peter Benkart![]() |
| Construction Bid Price: | $3,375,660.57 |
| District: | District 5 |
|
Bridges
|
||||||||||||||||||||
|
||||||||||
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||