Project Description:
MONTAGUE- REHABILITATION OF HATCHERY ROAD & GREENFIELD ROAD PEDESTRIAN BRIDGE, M-28-009, FROM GREENFIELD ROAD NORTHEASTERLY TO THE INTERSECTION OF TURNERS FALLS RD (.41 MILES)
The project will rehabilitate town-owned Hatchery Road in Montague. Since the demolition of the Greenfield Road Bridge over the B&M railroad, Hatchery Road has provided a detour connection between Turners Falls Road and the northerly section of Greenfield Road. The 0.41 mile reclamation/minor widening of Hatchery Road is required to formalize Hatchery Road as the permanent route, thus avoiding the costly replacement of the highway bridge over the railroad. Roadway improvements will include drainage system repairs/upgrades and related work. Under a separate project, a pedestrian bridge is proposed to be constructed at the former highway bridge site to provide a link for bicycles and pedestrians.
Location:
  • Town of Montague
  • Resident Engineer: William Whiteman
    Construction Contract Value: $3,239,249.90
    Construction Bid Price: $2,892,004.00
    Initial Construction Estimate: $3,003,000.00
    District: District 2

    Contracts (8) Progress
    # 51659 -- Design -- Bike/Ped Projects
    Work includes design and construction of a limited shared-use pedestrian-cyclist bridge on the site of a former highway bridge (M-28-009). Final
    # 57734 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassHighway on an open end basis for various highway and bridge projects. Final
    # 64309 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final
    # 64315 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final
    # 64326 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final
    # 68386 -- Design -- Bridge Open End
    Work will consist of providing engineering design and review services to MassDOT on an open end basis for various statewide highway and bridge projects. Final
    # 77864 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final
    # 85019 -- Construction Contract
    Roadway Reconstruction and Related Work along a Section of Hatchery Road and Pedestrian Bridge Replacement Br. No. M-28-009 (Steel) Greenfield Road over the Pan Am Railroad Completed

    Bridges

    Contract Dates
    Notice to Proceed: 09/01/2015
    Contract Information
    Project Designer: Consultant
    Funding Source: HIGH PRIORITY PROJECTS
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Review Committee PRC Approved 12/01/2005
    Project Review Committee Letter 12/27/2005
    Project Status Initiated 11/29/2005
    Project Status Advertised 09/20/2014
    Project Management
    100% Design 100% Package Received 07/07/2014
    100% Design 100% Package Comments to DE 08/26/2014
    25% Design 25% Package Received 12/06/2012
    25% Design 25% Package Comments to DE 07/29/2013
    25% Design Design Public Hearing 02/20/2014
    75% Design 75% Package Received 04/04/2014
    75% Design 75% Package Comments to DE 05/30/2014
    Final Design PS&E Received 09/04/2014
    Final Design PS&E to FAPRO 09/17/2014
    Consultant Contract Process Scope to DE 11/30/2007
    Consultant Contract Process NTP Issued 11/11/2009