Project Description:
SHREWSBURY- WORCESTER- BRIDGE REHABILITATION, S-14-001=W-44-018, STATE ROUTE 9 (BELMONT STREET) OVER LAKE QUINSIGAMOND (AKA - KENNETH F. BURNS BRIDGE)
The objective of the proposed project is to address the structural deficiencies and upgrade the structural capacity of the bridge where appropriate. The design will make accommodations for the sidewalk approaches to meet ADA standards. The proposed project will respect the documented historic status of the existing structure. The proposed work will include the preparation of an Environmental Assessment (EA) in accordance with the NEPA process and an Environmental Notification Form will be prepared that complies with the Massachusetts Environmental Policy Act (MEPA) and its associated regulations (301 CMR 11.00). The project will also include the preparation of a Programmatic Section 4(f) Evaluation in accordance with 4(f) evaluation criteria. Wetland resource areas will be delineated in accordance with the Massachusetts Wetlands Protection Act (MGL c. 131 § 40). Information, documentation and support will be prepared and provided to MHD to assist the Department in a Section 106 review process for the project.
Location:
  • Town of Shrewsbury
  • City of Worcester
  • Resident Engineer: Jeffrey Gorczynski
    Construction Contract Value: $110,358,103.65
    Construction Bid Price: $89,764,870.00
    Initial Construction Estimate: $118,000,000.00
    District: District 3

    Contracts (9) Progress
    # 34493 -- Design -- Footprint Bridge contracts
    Statewide - Footprint Bridge Round 5 - Contract D Final
    # 34494 -- Design -- Footprint Bridge contracts
    Statewide - Footprint Bridge Round 5 - Contract E Final
    # 57465 -- Design -- Bridge Open End
    Work will consist of providing engineering design, review and construction management services on a task order basis. Final
    # 59554 -- Design -- Bridge Open End
    Work will consist of providing engineering design and review services to MassHighway on an open end basis for various statewide highway and bridge ABP projects. Final
    # 60493 -- Non-system contract type
    Statewide - Owner's Representative will perform peer reviews and manage cost recovery and value engineering for various projects
    # 62937 -- Non-system contract type
    Statewide-Owner's Representative-Will perform peer reviews and manage cost recovery and value engineering for various projects.
    # 65756 -- Design -- Geotechnical
    Work will consist of Geotechnical Review during the design of bridge structures and/or roadways owned by MassDOT and Cities and Towns throughout the Commonwealth. Final
    # 69763 -- Design -- Bridge Open End
    Work will consist of providing engineering design and review services to MassDOT on an open end basis for various highway and bridge projects. Final
    # 70566 -- Construction Contract
    Bridge Replacement (S-14-001=W-44-018) (Steel) (Kenneth F. Burns Memorial Bridge) - Route 9 (Belmont Street) over Lake Quinsigamond. Completed

    Bridges

    Contract Dates
    Notice to Proceed: 05/18/2012
    Contract Information
    Project Designer: Consultant
    Funding Source: BRR OFF SYSTEM
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Review Committee PRC Approved 03/09/2006
    Project Review Committee Letter 03/21/2006
    Project Status Initiated 02/21/2006
    Project Status Advertised 12/03/2011
    Project Management
    25% Design 25% Package Received 04/15/2011
    Consultant Contract Process Scope to DE 03/01/2006
    Consultant Contract Process NTP Issued 07/24/2009
    Consultant Contract Process Workhours Approved 07/16/2009