WEST BROOKFIELD- RECONSTRUCTION ON ROUTE 9, ROUTE 67 & INTERSECTIONS AT SCHOOL STREET
This project involves work on town-owned School Street and its continuation as Church Street along with the intersections at Route 9, Route 67, and New Braintree Road. The total project length is approximately 0.40 miles. The project includes the realignment and reconfiguration of the Route 9, Route 67, and New Braintree Road intersections with School Street/Church Street along with the reconstruction and minor widening of School Street. The work will include new granite curbing, signing, pavement markings, drainage improvements and sidewalks with pedestrian crossings and wheelchair ramps. The existing town layout appears to be adequate for the proposed work.
Location:
  • Town of West Brookfield
  • Design Responsibility: Municipality
    Right of Way Responsibility: Municipality
    Project Manager: Carrie Lavallee
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 2
    Current Status: Final Package to FAPRO (as of 05/23/2016 )

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Status Initiated 03/03/2006
    Project Status PRC Approved 03/09/2006
    Project Status Letter 03/21/2006
    Project Management
    Consultant Contract Process 25% Package Received 06/03/2008
    Consultant Contract Process 25% Package Received 04/12/2013
    Consultant Contract Process 75% Package Received 04/13/2015
    Consultant Contract Process 100% Package Received 11/16/2015
    Consultant Contract Process PS&E Received 01/22/2016
    Consultant Contract Process PS&E Received 04/27/2016
    Consultant Contract Process 25% Package Comments to DE 03/03/2014
    Consultant Contract Process 75% Package Comments to DE 10/19/2015
    Consultant Contract Process 100% Package Comments to DE 01/11/2016
    Consultant Contract Process 25% Package Rejected 08/18/2008
    Consultant Contract Process Peer Review Comments to DE 03/07/2016
    Consultant Contract Process PS&E to FAPRO 05/23/2016
    Consultant Contract Process Design Public Hearing 04/16/2014