BROCKTON- BRIDGE BETTERMENT, B-25-048, ROUTE 123 (BELMONT STREET) OVER ROUTE 24
This project consists of a replacing the superstructure of the Belmont Street Bridge over Route 24. The existing superstructure will be replaced with a 128’-2” continuous two span steel beam bridge. The proposed bridge will be 60 wide from curb to curb with a 4 foot wide raised median and a 7’-2” wide sidewalk on each side of the bridge. The roadway shall be cold planed and overlaid from station 24+00 to the west abutment (approximately 793 ft) and from the east abutment to station 41+45 (approximately 832 ft). The proposed roadway will provide two 12 foot travel lanes in each direction, replacing the existing 4 foot wide raised median in kind, and shoulders of varying width. Roadway reconstruction entails improvements to guardrail at the bridge, relocation/installation of approximately 400 feet of 12 inch ductile iron water main, pavement markings, and a section of new sidewalk. Traffic on Belmont Street will be reduced to a minimum of one lane in each direction during the bridge construction. Traffic on Route 24 shall have three lanes open in each direction during daytime construction and shifted as shown on the plans for construction required during night time hours.
Location:
  • City of Brockton
  • Resident Engineer: Kenneth Belgrave
    Construction Contract Value: $4,149,417.70
    Construction Bid Price: $3,425,215.70
    Initial Construction Estimate: $4,188,457.75
    District: District 5

    Contracts (2) Progress
    # 56580 -- Construction Contract
    Bridge Superstructure Replacement (B-25-048) (Steel) Route 123 (Belmont Street) over Route 24. Completed
    # 57731 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassHighway on an open end basis for various highway and bridge projects. Final

    Bridges

    Contract Dates
    Notice to Proceed: 11/21/2008
    Contract Information
    Project Designer: Consultant
    Funding Source: Non Federal Aid
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Review Committee PRC Approved 03/09/2006
    Project Review Committee Letter 03/28/2006
    Project Status Initiated 03/03/2006
    Project Status Advertised 06/28/2008
    Project Management
    100% Design 100% Package Received 12/14/2007
    Final Design PS&E Received 05/14/2008
    Final Design PS&E to FAPRO 06/23/2008
    Consultant Contract Process Scope to DE 01/09/2006
    Consultant Contract Process NTP Issued 02/15/2006