Project Description:
LEXINGTON- BRIDGE PRESERVATION, L-10-017, SPRING STREET OVER ROUTE 2
Location:
  • Town of Lexington
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: MassDOT
    Project Manager: Bruce Sylvia
    Estimated Total Contract Cost: $925,160.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 4
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • L10017 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project