Project Description: |
DISTRICT 5- DRAINAGE REPAIR AND INSTALLATION AT VARIOUS LOCATIONS (AREA D)
REPAIR AND INSTALLATION OF DRAINAGE PIPES AND STRUCTURES AT VARIOUS LOCATIONS IN DISTRICT 5 AREA D
|
Location: | |
Resident Engineer: | Scott Semple |
Construction Contract Value: | $528,610.45 |
Construction Bid Price: | $481,210.45 |
Initial Construction Estimate: | $589,615.00 |
District: | District 5 |
|
Bridges |
|
|
|
|