DOVER- NEEDHAM- BRIDGE REPLACEMENT, D-10-005=N-04-006, CHESTNUT STREET OVER THE CHARLES RIVER
This bridge was originally constructed in 1922 and reconstructed in 1977. It is now considered structurally deficient and a design to replace the bridge has recently been initiated. Details of the replacement bridge type and number of spans have not yet been identified.
Location:
  • Town of Dover
  • Town of Needham
  • Project Manager: Adam W Kiel
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 6
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • D10005 
    See the Milestone Details tab for additional Project information