Project Description: |
DOVER- NEEDHAM- BRIDGE REPLACEMENT, D-10-005=N-04-006, CHESTNUT STREET OVER THE CHARLES RIVER
This bridge was originally constructed in 1922 and reconstructed in 1977. It is now considered structurally deficient and a design to replace the bridge has recently been initiated. Details of the replacement bridge type and number of spans have not yet been identified.
|
Location: |
|
Project Manager: | Adam W Kiel |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|