| Project Description: |
WEST BRIDGEWATER- PARK & RIDE UPGRADE AT ROUTE 106, WEST CENTER STREET & PLEASANT STREET
This project consists of the construction of a 40 space Park and Ride lot, and the overlay and restriping of the existing Park and Ride lot.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Muazzez G Reardon![]() |
| Estimated Total Contract Cost: | $446,309.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||