Project Description: |
METHUEN- RESURFACING ON ROUTE 113 (NORTH LOWELL STREET) EB & WB
The work to be done under this contract consists of cold planning and resurfacing the existing roadway (edge to edge). Work will also include adjusting, rebuilding and/or replacing drainage castings, cleaning drainage system pipes and structures, adjusting and/or replacing curbs or granite edging, repairing and installing guardrail, repairing and/or reconstructing sidewalks, and construction of wheelchair ramps.
|
Location: |
|
Resident Engineer: | Michael Cannata |
Construction Contract Value: | $2,282,268.00 |
Construction Bid Price: | $622,895.50 |
Initial Construction Estimate: | $928,074.00 |
District: | District 4 |
|
Bridges |
|
|
|
|