| Project Description: | METHUEN- RESURFACING ON ROUTE 113 (NORTH LOWELL STREET) EB & WB The work to be done under this contract consists of cold planning and resurfacing the existing roadway (edge to edge). Work will also include adjusting, rebuilding and/or replacing drainage castings, cleaning drainage system pipes and structures, adjusting and/or replacing curbs or granite edging, repairing and installing guardrail, repairing and/or reconstructing sidewalks, and construction of wheelchair ramps. | 
| Location: |  | 
| Resident Engineer: | Michael Cannata  | 
| Construction Contract Value: | $2,282,268.00 | 
| Construction Bid Price: | $622,895.50 | 
| Initial Construction Estimate: | $928,074.00 | 
| District: | District 4 | 
| 
 | Bridges | ||||||||
| 
 | ||||||||||
| 
 | 
| 
 | 
| 
 
 
 | ||||||||||||||||||||||||||||||||