Project Description: |
HAVERHILL- RIVERWALK CONSTRUCTION, FROM MUNICIPAL PARKING LOT OFF WASHINGTON STREET NEAR MBTA STATION TO EXISTING RIVERFRONT PARK (300 FEET)
This project includes the construction of a walking path on the land side of the riverwall behind the TAP restaurant, to connect to the existing Riverfront park. The parking lot will be reconfigured and repaved to achieve minimum reduction in parking spaces. Also included is redecking of the existing walkway segment behind the Haverhill Bank.
|
Location: |
|
Resident Engineer: | Ferris Hatem |
Construction Contract Value: | $1,415,332.74 |
Construction Bid Price: | $1,274,174.00 |
Initial Construction Estimate: | $1,594,584.50 |
District: | District 4 |
|
Bridges |
|
|
|
|