Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
HAVERHILL- RIVERWALK CONSTRUCTION, FROM MUNICIPAL PARKING LOT OFF WASHINGTON STREET NEAR MBTA STATION TO EXISTING RIVERFRONT PARK (300 FEET)
This project includes the construction of a walking path on the land side of the riverwall behind the TAP restaurant, to connect to the existing Riverfront park. The parking lot will be reconfigured and repaved to achieve minimum reduction in parking spaces. Also included is redecking of the existing walkway segment behind the Haverhill Bank.
Location:
  • City of Haverhill
  • Resident Engineer: Ferris Hatem
    Construction Contract Value: $1,415,332.74
    Construction Bid Price: $1,274,174.00
    Initial Construction Estimate: $1,594,584.50
    District: District 4

    Contracts (1) Progress
    # 57065 -- Construction Contract
    Haverhill - Riverwalk Construction and Related Work Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 01/12/2009
    Contract Information
    Project Designer: Municipality
    Funding Source: CONGESTION MIT. AIR QUAL.
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Review Committee PRC Approved 12/14/2006
    Project Review Committee Letter 01/03/2007
    Project Status Initiated 11/20/2006
    Project Status Advertised 08/02/2008
    Project Management
    100% Design 100% Package Received 09/24/2007
    100% Design 100% Package Comments to DE 02/15/2008
    25% Design 25% Package Received 03/23/2007
    25% Design Design Public Hearing 08/08/2007
    Final Design PS&E Received 04/08/2008
    Final Design PS&E Received 07/10/2008
    Final Design PS&E to FAPRO 07/29/2008