Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
MARSHFIELD-PEMBROKE - CORRIDOR IMPROVEMENTS ON ROUTE 139 (PLAIN STREET)
The project includes infrastructure improvements on Route 139 between the School Street and Furnace Street intersection approaches, a distance of approximately 4975 feet. The existing roadway section within the project includes one travel lane in each direction whereas the roadway sections at each end of the project include two travel lanes in each direction. Traffic bottlenecks occur where the two travel lanes on the approaches to the project merge to one. The project includes construction of two 12-foot travel lanes in each direction and two 6-foot shoulders, with 6-foot wide sidewalks on each side, resulting in a total proposed roadway section of 72 feet. Route 139 within the project is significantly developed, with commercial retail development as the predominant land use. Because the existing 65-foot wide right of way is insufficient for the proposed roadway section of 72 feet, all adjacent properties are impacted by the project. Impacts include loss of real estate, frontage landscaping, fence relocations or removal, parking, proprietary sign relocations or redesign, detention basin and proprietary drainage system relocation or redesign, and driveway reconstruction.
Location:
  • Town of Marshfield
  • Town of Pembroke
  • Resident Engineer: Matthew Lambert
    Construction Contract Value: $4,690,994.48
    Construction Bid Price: $4,139,139.74
    Initial Construction Estimate: $5,149,128.00
    District: District 5

    Contracts (5) Progress
    # 51303 -- Design -- Hwy Eng Open End
    Statewide - work will consist of providing engineering design and review services to the MassHighway on an open end basis for various statewide highway and bridge projects. Final
    # 57726 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassHighway on an open end basis for various highway and bridge projects. Final
    # 57915 -- Design -- Services
    Work will consist of providing engineering design services to the MassHighway on an open end basis for Layout and Right of Way assignments. Final
    # 64321 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final
    # 71100 -- Construction Contract
    Roadway Reconstruction and Related Work on a Section of Route 139 (Plain Street). Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 01/04/2012
    Contract Information
    Project Designer: Municipality
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Review Committee PRC Approved 12/14/2006
    Project Review Committee Letter 01/03/2007
    Project Status Initiated 11/28/2006
    Project Status Advertised 09/17/2011
    Project Management
    100% Design 100% Package Received 04/20/2011
    100% Design 100% Package Comments to DE 07/26/2011
    25% Design 25% Package Received 01/03/2008
    25% Design 25% Package Comments to DE 03/27/2009
    25% Design 25% Package Approved 05/14/2009
    25% Design Design Public Hearing 05/14/2009
    25% Design 25% Plans Complete 03/27/2009
    75% Design 75% Package Received 05/26/2010
    75% Design 75% Package Comments to DE 11/22/2010
    75% Design 75% Plans Approved 11/22/2010
    Final Design PS&E Received 08/23/2011
    Final Design PS&E to FAPRO 09/06/2011