| Project Description: |
CLINTON- RECONSTRUCTION & RELATED WORK ON WATER STREET AND BOLTON ROAD (1.2 MILES)
Water Street will be reconstructed from High Street to the Clinton/Bolton town line, a project length of approximately 1.2 miles. The proposed improvements includes a combination of reconstruction and resurfacing, sidewalk construction or reconstruction, and upgrading or installation of drainage structures. The proposed widening will provide bicycle accommodation.
|
| Location: |
|
| Project Manager: | Muazzez G Reardon![]() |
| Estimated Total Contract Cost: | $4,433,939.40 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|