Project Description:
CLINTON- RECONSTRUCTION & RELATED WORK ON WATER STREET AND BOLTON ROAD (1.2 MILES)
Water Street will be reconstructed from High Street to the Clinton/Bolton town line, a project length of approximately 1.2 miles. The proposed improvements includes a combination of reconstruction and resurfacing, sidewalk construction or reconstruction, and upgrading or installation of drainage structures. The proposed widening will provide bicycle accommodation.
Location:
  • Town of Clinton
  • Project Manager: Muazzez G Reardon
    Estimated Total Contract Cost: $4,433,939.40
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 3
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information