Project Description:
CLINTON- RECONSTRUCTION & RELATED WORK ON WATER STREET AND BOLTON ROAD (1.2 MILES)
Water Street will be reconstructed from High Street to the Clinton/Bolton town line, a project length of approximately 1.2 miles. The proposed improvements includes a combination of reconstruction and resurfacing, sidewalk construction or reconstruction, and upgrading or installation of drainage structures. The proposed widening will provide bicycle accommodation.
Location:
  • Town of Clinton
  • Construction Begins: Summer 2015
    Resident Engineer: Stephen Romano
    Construction Contract Value: $4,433,939.40
    Construction Bid Price: $3,988,604.00
    Initial Construction Estimate: $4,285,000.00
    District: District 3

    Contracts (2) Progress
    # 64315 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final
    # 85584 -- Construction Contract
    Roadway Reconstruction and Related Work on Water Street and Bolton Road. Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 09/01/2015
    Contract Information
    Project Designer: Municipality
    Funding Source: Other types not listed
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Review Committee PRC Approved 03/08/2007
    Project Review Committee Letter 03/22/2007
    Project Status Initiated 03/01/2007
    Project Status Advertised 11/01/2014
    Project Management
    100% Design 100% Package Received 05/20/2014
    100% Design 100% Package Comments to DE 07/28/2014
    25% Design 25% Package Received 12/09/2008
    25% Design 25% Package Received 03/12/2012
    25% Design Design Public Hearing 12/04/2012
    75% Design 75% Package Received 07/26/2013
    75% Design 75% Package Comments to DE 10/11/2013
    Final Design PS&E Received 09/19/2014
    Final Design PS&E to FAPRO 10/29/2014