Project Description: |
AGAWAM- SPRINGFIELD- BRIDGE PRESERVATION (PAINTING), A-05-001=S-24-005, ROUTE 5 OVER THE CONNECTICUT RIVER
The work to be done under this Route 5 Bridge Preservation Contract shall consist of cleaning and painting of all structural steel on the deck truss spans. The work includes, but is not limited to, repainting of the bridge truss girders, deck stringers, and bracing.
|
Location: |
|
Resident Engineer: | Joseph Borowiec |
Construction Contract Value: | $8,484,590.00 |
Construction Bid Price: | $6,828,600.00 |
Initial Construction Estimate: | $8,586,009.00 |
District: | District 2 |
|
Bridges
|
|
|
|
|