Project Description: |
SOUTHBOROUGH- RECONSTRUCTION OF MAIN STREET (ROUTE 30), FROM SEARS ROAD TO PARK STREET
The purpose of this project is to reconstruct Main Street in Southborough with the intent to create a consistent roadway width. A continuous sidewalk will also be constructed along the southern side of the project. The intersection of Main Street (Route 30) and Marlborough Street/Cordaville Road (Route 85) are proposed to be realigned to include a new traffic signal system and left turn only lanes.
|
Location: |
|
Construction Begins: | Autumn 2018 |
Resident Engineer: | Anthony Tavalone |
Construction Bid Price: | $6,732,884.00 |
District: | District 3 |
|
Bridges |
|
|
|
|