LUDLOW- RECONSTRUCTION OF CENTER STREET (ROUTE 21), FROM SEAWALL STREET TO BEACHSIDE DRIVE
The proposed project will reconstruct a portion of Center Street (Route 21) from Sewall Street to Beachside Drive. The project length is approximately 4,370 feet (0.83 miles). The work includes roadway reconstruction, a continuous sidewalk and a 5 foot shoulder on both sides of Center Street, granite curb installation, ADA compliant wheelchair ramps and driveway reconstruction, loam and seed, drainage system improvements and other incidentals to complete the project.
Location:
  • Town of Ludlow
  • Construction Begins: Spring 2018
    Resident Engineer: Joseph Gadbois
    Construction Bid Price: $3,659,388.50
    District: District 2

    Contracts (1) Progress
    # 102205 -- Construction Contract
    Roadway Reconstruction and Related Work (Including Signals) along a Section of Center Street (Route 21). Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 06/08/2018
    Contract Information
    Project Designer: Municipality
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Review Committee PRC Approved 06/14/2007
    Project Review Committee Letter 07/30/2007
    Project Status Initiated 06/07/2007
    Project Status Advertised 09/09/2017
    Project Management
    100% Design 100% Package Received 05/15/2017
    100% Design 100% Package Comments to DE 06/19/2017
    25% Design 25% Package Received 04/09/2010
    25% Design 25% Package Received 09/29/2015
    25% Design 25% Package Comments to DE 10/19/2012
    25% Design 25% Package Comments to DE 02/17/2016
    25% Design Design Public Hearing 08/09/2016
    75% Design 75% Package Received 02/02/2017
    75% Design 75% Package Comments to DE 03/21/2017
    Final Design PS&E Received 08/10/2017
    Final Design PS&E to Peer Reviewer 07/18/2017
    Final Design Peer Review Comments to DE 07/27/2017
    Final Design PS&E to FAPRO 08/29/2017