Project Description:
NEWBURYPORT- PARK & RIDE EXPANSION
The proposed expansion of the Newburyport Park & Ride facility will add 105 parking spaces. Work will include the construction of a soil nail retaining wall, upgrades to the existing lighting, as well as new lighting for the additional spaces. Drainage for the new area will be installed and connected to the existing drainage system. Deep sump catch basins and manholes will be used to minimize environmental impacts. The entire Park & Ride facility will be resurfaced and new pavement markings will be placed. Also included will be landscaping such as plantings and grass. Sidewalks will be constructed to meet ADA/AAB requirements. The facility will remain open during construction. The existing main parking lot will be resurfaced and striped at night.
Location:
  • City of Newburyport
  • Resident Engineer: Raymond Orsini
    Construction Contract Value: $4,087,754.00
    Construction Bid Price: $3,297,251.80
    Initial Construction Estimate: $3,044,301.76
    District: District 4

    Contracts (1) Progress
    # 59358 -- Construction Contract
    Expansion of Park & Ride Facility Route 113 (Storey Avenue). (ARRA Project) Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 08/13/2009
    Contract Information
    Project Designer: In-House Boston
    Funding Source: American Recovery & Reinvestment Act
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 06/28/2007
    Project Initiation Form PIF Entered 06/28/2007
    Project Initiation Form PRC Submitted 07/05/2007
    Project Review Committee PRC Approved 09/10/2007
    Project Review Committee Letter 11/20/2007
    Project Status Advertised 06/13/2009
    Project Management
    100% Design 100% Package Received 04/01/2009
    25% Design 25% Package Received 12/05/2008
    Final Design PS&E Received 06/08/2009
    Final Design PS&E to FAPRO 06/08/2009