| Project Description: |
NEW ASHFORD- LANESBOROUGH- RESURFACING & RELATED WORK ON ROUTE 7, FROM MM 41.68 TO MM 45.05
This project proposes to resurface Route 7 with hot-mix asphalt, and would also include repairing/improving the drainage system, resetting guardrail, upgrading guardrail end treatments, re-establishing and stabilizing roadway shoulders with dense graded crushed stone, applying thermoplastic pavement markings and providing new traffic signs as required.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Ashish Patel![]() |
| Estimated Total Contract Cost: | $2,223,781.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||