Project Description:
NEW ASHFORD- LANESBOROUGH- RESURFACING & RELATED WORK ON ROUTE 7, FROM MM 41.68 TO MM 45.05
This project proposes to resurface Route 7 with hot-mix asphalt, and would also include repairing/improving the drainage system, resetting guardrail, upgrading guardrail end treatments, re-establishing and stabilizing roadway shoulders with dense graded crushed stone, applying thermoplastic pavement markings and providing new traffic signs as required.
Location:
  • Town of Lanesborough
  • Town of New Ashford
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: MassDOT
    Project Manager: Ashish Patel
    Estimated Total Contract Cost: $2,223,781.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 1
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project