Project Description:
NATICK- RECONSTRUCTION OF ROUTE 27 (NORTH MAIN STREET), FROM NORTH AVENUE TO THE WAYLAND T.L.
The project begins on Route 27 (North Main Street) at North Avenue and extends northerly 2.2 miles to the Wayland town line, excluding the Route 9 interchange. The proposed improvements include minor widening of the section of roadway south of Route 9 to a more consistent cross-section. The pavement will be reconstructed utilizing reclaimed base course. Cement concrete sidewalks will be constructed on both sides of the roadway throughout the length of the project. The existing signals will be upgraded and, if warrants are met, new signals will be installed at Lake Street, Rutledge Road and Pine Street.
Location:
  • Town of Natick
  • Construction Begins: Summer 2020
    Resident Engineer: Julio Fontecchio
    Construction Bid Price: $12,703,882.90
    District: District 3

    Contracts (1) Progress
    # 109599 -- Construction Contract
    Roadway Reconstruction and Related Work (Including Signals) on Sections of Route 27 (North Main Street) 87% Complete

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 07/23/2020
    Contract Information
    Project Designer: Municipality
    Funding Source: FED. AID. ACCELERATED BRIDGE
    See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 08/31/2007
    Project Initiation Form PIF Entered 09/07/2007
    Project Initiation Form PRC Submitted 09/13/2007
    Project Review Committee PRC Approved 09/13/2007
    Project Review Committee Letter 12/20/2007
    Project Status Advertised 09/07/2019
    Project Management
    100% Design 100% Package Received 04/01/2019
    100% Design 100% Package Comments to DE 05/13/2019
    25% Design 25% Package Received 06/26/2009
    25% Design 25% Package Received 07/23/2016
    25% Design 25% Package Comments to DE 05/10/2019
    25% Design 25% Package Received - Resub 1 04/20/2018
    25% Design Design Public Hearing 06/22/2017
    75% Design 75% Package Received 08/06/2018
    75% Design 75% Package Comments to DE 10/31/2018
    Final Design PS&E Received - Resub 1 08/06/2019