| Project Description: |
BECKET- BRIDGE PRESERVATION, B-03-016, McNERNEY ROAD OVER SHAKER MILL BROOK
The proposed work for the bridge carrying McNerney Road over Shaker Mill Brook will consist of replacing the existing metal arch with a rigid concrete frame that will be designed for AASHTO HS25 Loading. The work will involve stream bed restoration to address the local scour issues.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Hemendra Bhatt![]() |
| Estimated Total Contract Cost: | $1,032,378.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|