Project Description:
WORCESTER- RECONSTRUCTION OF LINCOLN STREET (ROUTE 70), FROM MARSH AVENUE TO PLANTATION STREET (PHASE II)
The project’s proposed Phase 2 Lincoln Street Reconstruction stretches from Marsh Avenue to Plantation Street. The work includes widening of Lincoln Street to include a 4-foot wide shoulder on each side, new sidewalks, and turning lanes at Lincoln Plaza; reconfiguring the Lincoln Street and Pasadena Parkway intersection; and a roundabout at the intersection of Lincoln Street, Boylston Street and Benson Avenue. The traffic signals will be updated and coordinated along Lincoln Street, at its intersections with: 1) Goldthwaite Road and Trinity Avenue, 2) Country Club Boulevard, 3) Lincoln Plaza West and East Driveways; and 4) at the pedestrian crossing near Tyler Prentice Road. Bicycle accommodations consisting of 4-foot wide shoulders have been provided in accordance with applicable design guides.
Location:
  • City of Worcester
  • Design Responsibility: Consultant
    Right of Way Responsibility: Municipality
    Project Manager: Brian Chapman
    Estimated Total Contract Cost: $7,290,302.95
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 3
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project