Project Description:
CHICOPEE-WEST SPRINGFIELD- BRIDGE PRESERVATION, C-13-034=W-21-043, I-91 OVER CONNECTICUT RIVER
The proposed work for the bridge carrying I-91 over the Connecticut River consists of retrofitting the Pin and Hanger assemblies on these structures. This work will be performed to avoid load posting Interstate I-91 for the numerical load rating values, provide a system redundancy, and reduce the potential for failure associated with the existing fracture critical detailing.
Location:
  • City of Chicopee
  • Town of West Springfield
  • Resident Engineer: George Pelletier
    Construction Contract Value: $3,928,722.50
    Construction Bid Price: $3,329,637.50
    Initial Construction Estimate: $1,572,913.00
    District: District 2

    Contracts (2) Progress
    # 30144 -- Design -- Bridge Rehab/Recon/New Const
    Statewide - Open End contract for Bridge Rehabilitation, Highway Operations Division. Final
    # 56338 -- Construction Contract
    Bridge Rehabilitation (C-13-034=W-21-043) (Steel) - I-91 over the Connecticut River. Completed

    Bridges

    Contract Dates
    Notice to Proceed: 10/27/2008
    Contract Information
    Project Designer: Consultant
    Funding Source: Non Federal Aid
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 10/26/2007
    Project Initiation Form PIF Entered 10/30/2007
    Project Initiation Form PRC Submitted 11/28/2007
    Project Review Committee PRC Approved 12/13/2007
    Project Review Committee Letter 02/15/2008
    Project Status Advertised 06/21/2008
    Project Management
    Final Design PS&E Received 06/18/2008
    Final Design PS&E to FAPRO 06/18/2008
    Consultant Contract Process Scope to DE 06/15/2007
    Consultant Contract Process NTP Issued 07/23/2007