| Project Description: |
CHICOPEE-WEST SPRINGFIELD- BRIDGE PRESERVATION, C-13-034=W-21-043, I-91 OVER CONNECTICUT RIVER
The proposed work for the bridge carrying I-91 over the Connecticut River consists of retrofitting the Pin and Hanger assemblies on these structures. This work will be performed to avoid load posting Interstate I-91 for the numerical load rating values, provide a system redundancy, and reduce the potential for failure associated with the existing fracture critical detailing.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Hemendra Bhatt![]() |
| Estimated Total Contract Cost: | $3,928,722.50 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 2 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||