Project Description: |
AUBURN- BRIDGE SUPERSTRUCTURE REPLACEMENT, A-17-036 (1QN & 1QP), I-290 (EB & WB) OVER SR 12 (SOUTHBRIDGE STREET)
The work for the I-290 over Route 12 bridges shall consist of reconstructing the bridge and approach wearing surface; partially replacing the reinforced concrete deck slab; upgrading the bridge rail; upgrading the approach guard rail; eliminating the bridge joints; repairing the existing substructure; and painting the structural steel.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Harry Adolphe![]() |
Estimated Total Contract Cost: | $4,469,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 3 |
Current Status: | This project is in the preliminary design phase. |
|