SWANSEA- RESURFACING & RELATED WORK ON ROUTE 6
Work on this project consists of milling and resurfacing of Route 6 in Swansea from the Somerset Town Line to the Rehoboth Town Line. Repair of frost heaves and the reconstruction of existing sidewalks is also included.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | Albert Li![]() |
Estimated Total Contract Cost: | $3,918,890.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 5 |
Current Status: | This project is in the preliminary design phase. |
|