| Project Description: |
DISTRICT 4- DRAINAGE STRUCTURES & SYSTEMS CLEANING AT VARIOUS LOCATION (AREA 4A)
Work will include the cleaning of drainage structures and systems along various roadways throughout Area 4A as assigned by the Engineer.
|
| Location: | |
| Resident Engineer: | Walter Ulwick![]() |
| Construction Contract Value: | $262,430.00 |
| Construction Bid Price: | $240,930.00 |
| Initial Construction Estimate: | $399,500.00 |
| District: | District 4 |
|
Bridges |
||||||||
|
||||||||||
|
|
|
||||||||||||||||||||||||||||||||