| Project Description: |
DISTRICT 4- DRAINAGE STRUCTURES & SYSTEMS CLEANING AT VARIOUS LOCATION (AREA 4C)
Work will include cleaning drainage structures and systems along various roadways throughout Area 4C as assigned by the Engineer.
|
| Location: | |
| Resident Engineer: | Thomas Gordon![]() |
| Construction Contract Value: | $146,605.00 |
| Construction Bid Price: | $115,105.00 |
| Initial Construction Estimate: | $203,450.00 |
| District: | District 4 |
|