| Project Description: |
DISTRICT 4- DRAINAGE STRUCTURES & SYSTEMS CLEANING AT VARIOUS LOCATION (AREA 4D)
Work will include cleaning drainage structures and systems along various roadways throughout Area 4D as assigned by the Engineer.
|
| Location: | |
| Resident Engineer: | James Flaherty Jr![]() |
| Construction Contract Value: | $349,788.00 |
| Construction Bid Price: | $288,288.00 |
| Initial Construction Estimate: | $503,500.00 |
| District: | District 4 |
|