| Project Description: |
TAUNTON- RESURFACING & RELATED WORK ON ROUTE 44 FROM ARLINGTON STREET TO ROUTE 104
Work on this project consists of milling and resurfacing Route 44 in Taunton from Arlington Street (MM 15.11) to just west of the intersection with Route 104 (MM 15.68). Reconstruction of existing sidewalks will also be included in the contract for Route 44.
|
| Location: |
|
| Project Manager: | Albert Li![]() |
| Estimated Total Contract Cost: | $990,020.90 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|