Project Description:
NEWTON- WESTON- BRIDGE BETTERMENT, N-12-058=W-29-012, ROUTE 128 SERVICE ROAD OVER CHARLES RIVER
The work for the project to rehabilitate the Route 128 Service Road bridge over the Charles River shall consist of reconstructing the bridge and approach wearing surface; removal and replacement of the reinforced concrete T-beams; upgrading the bridge rail; upgrading the approach guard rail; removing and replacing the existing joints with Asphaltic joints over the abutments; removing and replacing bearings with reinforced elastomeric bearing pads; removing and replacing the existing drainage scuppers with new ones; repairing the existing substructure and beams seats.
Location:
  • City of Newton
  • Town of Weston
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Hercules L Kyriazidis
    Estimated Total Contract Cost: $5,270,225.25
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 6
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • N12058 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project