Project Description:
MALDEN- REHABILITATION ON PLEASANT STREET, FROM MALDEN CITY HALL TO MAIN STREET
The project includes concrete pavement restoration and/or rehabilitation of Pleasant Street from Malden City Hall to Main Street. The pavement restoration/rehabilitation work at the connecting sides streets, consisting of Abbott Street, Washington Street, Dartmouth Street and Main Street is limited to within 25 feet of each respective intersection. The work also includes installation or repair of brick sidewalk; concrete sidewalk; ornamental lighting, flowering trees and other streetscape amenities; pedestrian ramps; crosswalks; signals and pavement markings. An open parking lot will also be installed in the vicinity of the former Linden Avenue with access from Pleasant Street.
Location:
  • City of Malden
  • Design Responsibility: Municipality
    Right of Way Responsibility: Municipality
    Project Manager: David Shedd
    Estimated Total Contract Cost: $1,589,768.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 4
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information