| Project Description: |
DISTRICT 4- BRIDGE REHABILITATION, B-16-235, ROUTE 1A (EAST BOSTON EXPRESSWAY)
This is a portion of the East Boston Expressway that was not included in the betterment project for the airport ramps. This portion is a very rough drive and a conspicuous eye sore while going to and exiting from the airport.
|
| Location: | |
| Resident Engineer: | Greg Kwon![]() |
| Construction Contract Value: | $2,875,375.00 |
| Construction Bid Price: | $2,395,075.00 |
| Initial Construction Estimate: | $2,470,200.00 |
| District: | District 4 |
|
Bridges
|
||||||||
|
||||||||||
|
|
|
||||||||||||||||||||||||||||||||