Project Description:
METHUEN- INTERCHANGE RECONSTRUCTION ON I-93 AT ROUTE 110/113 ROTARY, INCLUDING REMOVAL OF M-17-017 & M-17-018, REHAB OF M-17-007 & NEW BRIDGE CONSTRUCTION OF M-17-040
The project will eliminate the rotary and realign Routes 110 and 113 under I-93 and result in a continuous through movement for Route 113 west of the rotary to Route 110 east of the rotary. Routes 110 and 113 west and east of the rotary would be realigned to provide a four-leg and a “T” intersection, respectively. The preferred alternative calls for a partial cloverleaf interchange. The interchange ramps would be realigned with new loops located in the northeast and northwest quadrants. The first loop would provide the movement from westbound Route 110/113 to the southbound on-ramp in the northwest quadrant, and the second from the northbound off-ramp to westbound Route 110/113 in the northeast quadrants.
Location:
  • Town of Methuen
  • Resident Engineer: Jeffrey Lavallee
    Construction Contract Value: $66,385,292.70
    Construction Bid Price: $56,450,977.00
    Initial Construction Estimate: $63,204,629.00
    District: District 4

    Contracts (14) Progress
    # 115773 -- Design -- Services
    Statewide - Master Service Agreement for design and review services. Final
    # 41489 -- Design -- Geotechnical
    Statewide - implement geophysical methods on statewide designed and constructed bridge and highway projects. Final
    # 51301 -- Design -- Hwy Eng Open End
    Statewide - work will consist of providing engineering design and review services to the MassHighway on an open end basis for various statewide highway and bridge projects. Final
    # 51303 -- Design -- Hwy Eng Open End
    Statewide - work will consist of providing engineering design and review services to the MassHighway on an open end basis for various statewide highway and bridge projects. Final
    # 54666 -- Design -- MEPA/NEPA Compliance
    Work will consist of preliminary design and the preparation of a Draft and Final Environmental Impact Report/Environmental Analysis foe the methien Rotary Project. Final
    # 57735 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassHighway on an open end basis for various highway and bridge projects. Final
    # 62936 -- Non-system contract type
    Statewide-Owner's Representative-Will perform peer reviews and manage cost recovery and value engineering on various projects.
    # 62938 -- Non-system contract type
    Statewide-Owner's Representative-Will perform peer reviews and manage cost recovery and value engineering for various projects .
    # 64323 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final
    # 76262 -- Non-system contract type
    Perform various assignments as the Owner's Representative for the peer review of engineering elements associated with satewide construction projects.
    # 77870 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final
    # 77884 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final
    # 79297 -- Construction Contract
    Interchange Reconstruction on Interstate 93 at Route 110 and 113 Methuen Rotary. Completed
    # 80638 -- Non-system contract type
    Statewide - Owner's Representative will perform peer reviews and manage cost recovery and value engineering for various projects

    Bridges

    Contract Dates
    Notice to Proceed: 05/16/2014
    Contract Information
    Project Designer: Consultant
    Funding Source: CONGESTION MIT. AIR QUAL.
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 05/08/2008
    Project Initiation Form PIF Entered 05/08/2008
    Project Initiation Form PRC Submitted 05/19/2008
    Project Review Committee PRC Approved 06/12/2008
    Project Review Committee Letter 07/16/2008
    Project Status Advertised 08/17/2013
    Project Management
    100% Design 100% Package Received 11/01/2012
    25% Design 25% Package Received 06/28/2010
    25% Design 25% Package Comments to DE 04/25/2011
    25% Design 25% Package Comments to DE 09/12/2011
    25% Design 25% Package Approved 11/09/2010
    25% Design Design Public Hearing 01/11/2011
    25% Design 25% Plans Complete 06/28/2010
    75% Design 75% Package Received 11/14/2011
    75% Design 75% Plans Complete 11/15/2011
    Final Design PS&E Received 05/21/2013
    Final Design PS&E to FAPRO 07/15/2013
    Consultant Contract Process Scope to DE 07/10/2008
    Consultant Contract Process NTP Issued 01/23/2009
    Consultant Contract Process Workhours Approved 10/21/2008