| Project Description: |
LANESBOROUGH- PITTSFIELD- RESURFACING & RELATED WORK ON ROUTE 8
This project would resurface 3.6 miles of Route 8 (from MM 44.1 to the Lanesborough/Cheshire TL) with 1.5 inches of hot-mix asphalt as a pavement preservation measure.
|
| Location: |
|
| Resident Engineer: | John Blaisdell![]() |
| Construction Contract Value: | $1,395,713.00 |
| Construction Bid Price: | $1,231,103.00 |
| Initial Construction Estimate: | $1,183,846.00 |
| District: | District 1 |
|
Bridges |
||||||||
|
||||||||||
|
|
|
||||||||||||||||||||||||||||||||