LANESBOROUGH- PITTSFIELD- RESURFACING & RELATED WORK ON ROUTE 8
This project would resurface 3.6 miles of Route 8 (from MM 44.1 to the Lanesborough/Cheshire TL) with 1.5 inches of hot-mix asphalt as a pavement preservation measure.
Location:
  • Town of Lanesborough
  • City of Pittsfield
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: MassDOT
    Project Manager: Albert Li
    Estimated Total Contract Cost: $1,395,713.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 1
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project