Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
FALL RIVER- INTERCHANGE IMPROVEMENTS AT ROUTE I-195/ROUTE 79/ROUTE 138 INCLUDING BRAGA BRIDGE PHASE 2 CLEANING/PAINTING AND STRUCTURAL REPAIRS
Work on this project consists of reconfiguration of the Route I-195/Route 79/Route 138 interchange including all ramps and associated bridges. A primary objective of this project is to provide safety improvements and eliminate structurally deficient bridges. The existing bridge structures will be removed and replaced with new bridges and at-grade roadways. The project includes safety improvements by eliminating substandard weaving areas and providing positive control at intersections. Regional connectivity will be maintained while improving local access. Bicycle and pedestrian access will also be improved. In addition the Design-Build project will include the addition of Braga Bridge Phase 2 Cleaning/Painting and Structural Repairs
Location:
  • City of Fall River
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Amy E Getchell
    Estimated Total Contract Cost: $227,987,382.33
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 5
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • F02058 
    • F02059 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project