| Project Description: |
FRAMINGHAM- BRIDGE REPLACEMENT, F-07-001, ROUTE 9 (WORCESTER ROAD) OVER RESERVOIR OUTLET
The purpose of this project is to replace the superstructure of the Route 9 bridge over the Reservoir Outlet connecting the Foss Reservoir No. 3 to the Stearnes Reservoir No. 1.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Manhar Patel![]() |
| Estimated Total Contract Cost: | $10,388,249.04 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|