Project Description:
|
BELLINGHAM- FRANKLIN- BRIDGE PRESERVATION, B-06-019, B-06-020, F-08-022, F-08-023, OVER/UNDER I-495
The work for all the bridges in this project shall consist of joint work, the sounding of the reinforced concrete deck, mapping the deteriorated areas which need to be partially replaced, removing and replacing the existing bearing. The project will also add a plate and replace the diaphragm for the Farm Street Bridge over Interstate 495. The proposed work also includes cleaning and painting the structural steel, reconstructing the bridge and approach wearing surfaces; reconstruct the approach sidewalk to the bridge and patching any deterioration in concrete surfaces.
|