CHICOPEE- SOUTH HADLEY- RESURFACING, CONCRETE REPAIRS & RELATED WORK ON ROUTE 33 (MEMORIAL DRIVE)
The proposed pavement preservation will consist of concrete and asphalt surface pavements. The asphalt preservation consists of a functional overlay with a milling and overlay 1 ½” Superpave Surface Course 12.5 (SSC-12.5) over 1 ¼” micro-milling. Some localized pavement repairs to the existing pavement will be made prior to resurfacing. The concrete pavement consists of concrete pavement repairs (CPR): full and partial depth concrete repairs, joint resealing, crack sealing, joint and surface spall repair, diamond grinding and asphalt shoulder seal. Other work includes the wire loop replacement, pavement markings and traffic management.
Location:
  • City of Chicopee
  • Town of South Hadley
  • Resident Engineer: Jonathan Giraldo
    Construction Contract Value: $5,168,188.00
    Construction Bid Price: $3,627,557.50
    Initial Construction Estimate: $4,266,859.00
    District: District 2

    Contracts (1) Progress
    # 67216 -- Construction Contract
    Resurfacing and Related work (Including Concrete Pavement Repairs) on a Section of Route 33 (Memorial Drive). Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 03/01/2011
    Contract Information
    Project Designer: In-House Boston
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 08/15/2008
    Project Initiation Form PIF Entered 08/15/2008
    Project Initiation Form PRC Submitted 09/11/2008
    Project Review Committee PRC Approved 11/06/2008
    Project Status Advertised 07/31/2010
    Project Management
    75% Design 75% Package Received 03/25/2010
    75% Design 75% Package Comments to DE 07/06/2010
    Final Design PS&E Received 07/23/2010
    Final Design PS&E to FAPRO 07/28/2010