| Project Description: |
BEVERLY- SALEM- BRIDGE REPLACEMENT, B-11-005=S-01-013, KERNWOOD AVENUE OVER DANVERS RIVER (DRAWBRIDGE) (DESIGN-BUILD)
The purpose of this project is to replace the existing structure with a single rolling leaf bascule bridge.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Robert P Antico![]() |
| Estimated Total Contract Cost: | $248,695,634.78 |
| Estimated Total Federal Participating Construction Cost: | $260,000,000.00 |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|