Project Description: |
BEVERLY- SALEM- BRIDGE REPLACEMENT, B-11-005=S-01-013, KERNWOOD AVENUE OVER DANVERS RIVER AND B-11-001, BRIDGE STREET OVER BASS RIVER (HALL-WHITAKER DRAWBRIDGE)
A preliminary type study and a Value Engineering study shall help to determine whether this bridge should be replaced or rehabilitated. If replacement, then 3 options shall be explored: a fixed high span bridge; replacement of only the approach timber spans; and a complete bridge replacement with a movable span and fixed approach spans.
|
Location: |
|
Design Responsibility: | Consultant |
Construction Begins: | Spring 2027 |
Project Manager: | Robert P Antico |
Estimated Total Contract Cost: | $78,652,000.00 |
Estimated Total Federal Participating Construction Cost: | $82,227,100.00 |
Funding Provision: | This project is planned to be funded through the 2027 Transportation Improvement Program for the Boston Metropolitan Planning Organization. |
District: | District 4 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|