Project Description: |
HAVERHILL- BRIDGE REPLACEMENT, H-12-039, I-495 (NB & SB) OVER MERRIMACK RIVER
This project will replace the existing five (5) span structurally deficient bridges that carry I-495 NB/SB over the Merrimack River in the City of Haverhill with new three (3) span steel structure bridges with concrete abutments and piers. The project shall be constructed in stages to maintain traffic on I-495. The new I-495 NB bridge will include an auxiliary lane.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Spring 2018 |
Project Manager: | Narayana Kolla |
Estimated Total Contract Cost: | $105,315,105.24 |
Estimated Total Federal Participating Construction Cost: | $108,833,832.05 |
District: | District 4 |
Current Status: | This project has been advertised for construction bids. (as of 01/13/2018 ) |
|