Project Description:
RAYNHAM- TAUNTON- BRIDGE REPLACEMENT, R-02-012=T-01-049 (3MR), SR 24 OVER THE TAUNTON RIVER
This project consists of the bridge replacement of the bridge carrying Route 24 over the Taunton River. The proposed structure will be a single span structure supported on integral abutments. The span between the centerlines of abutments will be approximately 175 feet and be comprised of galvanized steel plate girders and a reinforced concrete deck. The proposed roadway width for each bound will consist of a 2 foot shoulder, three 12 foot lanes, a 12 foot acceleration of deceleration lanes, and a 4 foot shoulder. This cross section will be constructed using staged construction with a minimum of two lanes in each direction at all times. The minimum lane width during the construction will be 11 feet.
Location:
  • Town of Raynham
  • Resident Engineer: Aleksey Belov
    Construction Contract Value: $17,036,765.00
    Construction Bid Price: $14,243,274.00
    Initial Construction Estimate: $13,140,412.46
    District: District 5

    Contracts (4) Progress
    # 59588 -- Design -- Bridge Open End
    Work will consist of providing engineering design and review services to MassHighway on an open end basis for various statewide highway and bridge ABP projects. Final
    # 69759 -- Design -- Bridge Open End
    Work will consist of providing engineering design and review services to MassDOT on an open end basis for various highway and bridge projects. Final
    # 77854 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final
    # 79518 -- Construction Contract
    Bridge Replacement (Including Painting) (R-02-012=T-01-049) (Steel) - Route 24 over the Taunton River. (ABP) Completed

    Bridges

    Contract Dates
    Notice to Proceed: 02/19/2014
    Contract Information
    Project Designer: Consultant
    Funding Source: Non Federal Aid
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 09/02/2008
    Project Initiation Form PIF Entered 01/27/2009
    Project Initiation Form PRC Submitted 02/03/2009
    Project Review Committee PRC Approved 02/12/2009
    Project Review Committee Letter 02/27/2009
    Project Status Advertised 08/31/2013
    Project Management
    25% Design 25% Package Received 06/01/2012
    25% Design Design Public Hearing 01/10/2013
    75% Design 75% Package Received 03/13/2013
    75% Design 75% Package Comments to DE 05/15/2013
    Final Design PS&E Received 07/19/2013
    Final Design PS&E to FAPRO 08/28/2013
    Consultant Contract Process NTP Issued 02/02/2011
    Consultant Contract Process Workhours Approved 10/28/2011