Project Description: |
RAYNHAM- BRIDGE REPLACEMENT, R-02-013 (3PA), US 44 (CAPE HIGHWAY) OVER SR 24
The bridge is to be replaced with a 2-span continuous superstructure of approximately 103 feet (west span) and 121 feet (east span). The anticipated superstructure system is steel plate girders. Accelarated construction techniques such as roll-in / roll-out will be used to slide the new superstructure in place.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Winter 2017/2018 |
Project Manager: | Valerie E Kilduff |
Estimated Total Contract Cost: | $23,515,040.26 |
Estimated Total Federal Participating Construction Cost: | $26,219,351.40 |
District: | District 5 |
Current Status: | This project has been advertised for construction bids. (as of 09/02/2017 ) |
|