Project Description:
RAYNHAM- BRIDGE REPLACEMENT, R-02-013 (3PA), US 44 (CAPE HIGHWAY) OVER SR 24
The bridge is to be replaced with a 2-span continuous superstructure of approximately 103 feet (west span) and 121 feet (east span). The anticipated superstructure system is steel plate girders. Accelarated construction techniques such as roll-in / roll-out will be used to slide the new superstructure in place.
Location:
  • Town of Raynham
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Valerie E Kilduff
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 5
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • R02013 
    See the Milestone Details tab for additional Project information